After meeting with Mark, we determined that the goal of his remodel was that he wanted to convert his typical 2000s master bath into a transitional and functional area and get more storage.
The standard cultured marble walls and soaking tub wasn’t exactly what he wanted any longer.
Jeff and Lisa were a pleasure to work with, from the start.
As we met to determine a design goal, we began to see that they wanted a warm and inviting bathroom.
Their existing vanity was perfect to fit in their design.
We had a great time working with John & Kristen on their master bathroom renovation.
They were so nice and easy to get along with from the beginning to the end of the project.
They have a house built in the 2000s and wanted to give a new look to their master bathroom.
It was great working with Ashley & John on their 3 bathroom remodels.
They wanted to start over from scratch so we removed everything.
They wanted the shower to be larger so we extended it out into the room and they love how it turned out.
It was fun working on this kitchen for David.
He wanted a fresh new look of his kitchen, but retaining his existing kitchen appliances except for a new trash compactor.
Our main goal is to remodel the kitchen to make it look bright, clean, and modern.
It was so much fun working with McKenna & Cameron on their renovation project.
They were looking for a new look and feel for each space, and with the help of our designer, they got incredible results.
We really enjoyed helping James & Barb with their renovation project.
They were looking to bring it up to date and add elegant details to the kitchen & master bathroom.
It was a pleasure helping Phil & Sanya renovate their master bathroom, and transform it into a spa-like sanctuary.
Here are some of the items they had us complete to get their dream bathroom:
Build a custom shower that includes a dry-off area.

