It was fun working on this kitchen for Tiffany.
The kitchen was outdated.
Tiffany wanted a new kitchen that is fresh, modern, and chic.
It was a joy working with Kim on her 2 bathroom remodels in Ahwatukee.
Kim is detail oriented and type A like myself and we were able to create 2 dream bathrooms she loves.
Her master bathroom had the builder grade shower insert, countertops, faucets and accessories like mirrors and medicine cabinets.
We had fun working with Christie on her bathroom remodels.
The first projects she wanted done was the guest bathroom for kids.
We removed the wall between the vanity area and the shower/toilet room.
We’ve had the pleasure of working with Elizabeth on her home in the past.
This time we remodeled her master bathroom.
The shower was sunk in quite a bit which was a safety hazard and frankly just ugly.
It was a blast working with Paul.
We remodeled his guest bathroom and master bathroom remodel in Ahwatukee.
The master bathroom had the original builder look & materials that he wanted renovated.
It was great working with Alisa and John.
We originally were going to keep the bathtub but it was all one piece with the shower.
After examining and seeing inside, the best option was to replace the bathtub.
Mary choose subway shower wall tile that we covered across the entire wall to give it a really nice clean look.
We also built a pony wall with the subway tile on both sides.
They wanted a glass panel above the pony wall.
We enjoyed working on this master bathroom with Derek and Vivian.
The shower had the gold frame enclosure, outdated cultured marble look along with bad water damage on the bottom outside of shower.
They wanted a longer shower so we removed the small vanity and the bathtub.

