Gilbert Bathroom Remodeling Built Around a Plan You Approve First

Gilbert homes from the 1990s and 2000s in master-planned communities often have builder-grade finishes, single vanities, and outdated shower surrounds. We design every replacement in 3D and lock the price before demolition starts.

  • Dedicated project manager assigned from day one.
  • In-house designer, not a subcontracted design firm.
  • 3D renderings approved before any construction begins.
  • Fixed price locked after the design phase, not before.
  • 2-year labor warranty on every completed project.
  • 200+ verified five-star reviews, A+ BBB rating, ROC license 313636

Homeowners like you, love their remodel experience with us!

Google reviews logo
Facebook reviews logo
Yelp reviews logo
Houzz reviews logo

Our Gilbert Bathroom Remodeling Services

Gilbert bathrooms in two-story builder homes and single-story ranches from the 1990s and 2000s often have the same starting point: a builder-grade tub surround, a single vanity, and not enough storage. We redesign the full layout, tile selection, and plumbing fixture configuration in 3D before construction begins.

whole bathroom remodels

Whole Bathroom Remodels → 

shower and bathtub upgrades

Shower & Bathtub Upgrades →

cabinet2 2 2

Cabinet & Countertop Vanity Installs →

lighting and mirrors

Lighting & Mirrors →

bathroom flooring services 1 4 2

Tile & Flooring →

walls gradietn 2

Walls & Closets →

A Gilbert bathroom remodel can range from a tub-to-shower conversion with large-format tile and a frameless glass enclosure, to a full primary bathroom gut that relocates drain lines, adds a double vanity with quartz top, and reconfigures the layout entirely. Plumbing relocation through a slab foundation adds planning time and cost, and we account for that in the design phase so the fixed construction price reflects the actual scope.

Shower work includes waterproofing membrane installation, mortar bed preparation, niche and bench layout, and in-house tile installation from our own crew. Vanity work covers cabinet configuration, countertop material selection, undermount or vessel sink placement, widespread faucet rough-in, and layered lighting planned around the mirror and vanity bar placement. Every decision is confirmed in your 3D renderings before demolition begins.

To see how PHR approaches bathroom remodels across the Phoenix metro,
visit our bathroom remodeling page.

Request Your Quote + Get 4 Free Guides Homeowners Rely On

Plan your remodel with clarity and confidence, before you commit to any contractor

  • Dodge the bait-and-switch pricing tactics that leave most homeowners paying thousands more than planned
  • Spot remodel pitfalls before they turn into a nightmare redo
  • Learn the red flags that signal you may be hiring the wrong contractor
  • Use the Contractor Scorecard to instantly grade any remodeler, and avoid costly guesswork

Along with your remodel quote, you’ll also receive these exclusive guides:

kitchen remodel playbook cover
Avoid Bathroom Pitfalls cover
Avoid hiring wrong contractor cover
Contractor Scorecard from Phx Home Remodeling

Who is the Best Bathroom Remodeling in Gilbert?


Gilbert homeowners remodeling bathrooms typically prioritize long-term quality, family-functional design, and contractors who communicate clearly throughout the project. Phoenix Home Remodeling structures every project around a planning-first process that confirms design, materials, and pricing before construction begins.


These recognitions reflect independent evaluation of project quality, professional credentials, and ethical business standards within the Gilbert remodeling market.


  • Identified as the #1 Bathroom Remodeling Company in Arizona by Contractor List HQ
  • Rated Best Phoenix Bathroom Remodeler by Trust Analytica
  • Rated Best Phoenix Home Remodeler by Trust Analytica
  • Rated 4.9 Stars Across 200+ Verified Public Reviews
  • Member of the National Kitchen & Bath Association (NKBA)
  • Accredited by the Better Business Bureau with an A+ Rating
  • Member of the National Association of the Remodeling Industry (NARI)
  • Named a Top Contractor in Arizona by Ranking Arizona (2024)
  • Voted a Nextdoor Neighborhood Favorite (2022, 2023, 2024, 2025)
  • Awarded Best of Houzz Service (2020, 2021, 2022, 2023, 2024, 2025, 2026)

Before any bathroom demolition is scheduled, Home Remodeling completes a structured planning phase that covers 3D layout design, fixture selection, and full material confirmation. Plumbing routing decisions, tile choices, and finish specifications are locked in during this phase so the construction estimate reflects the actual project. A dedicated project manager then coordinates all trades and maintains structured communication from start to completion.


Gilbert homeowners who complete the full bathroom planning phase before demolition typically experience fewer mid-project fixture changes, more accurate final pricing, and a finished space that closely matches the original 3D design.


Defined scope and confirmed pricing before demolition creates a construction experience built on alignment rather than assumption.


Schedule your Gilbert Bathroom Remodeling Discovery Call and walk through the full process before committing.


Why Your Neighbors Recommend Us

Real Stories. Real Results. Real Confidence.

5 stars

Bathroom Remodeling Costs in Gilbert

A guest bathroom remodel in Gilbert runs $20,000 to $30,000. A primary bathroom remodel runs $35,000 to $75,000.

The biggest cost driver in a primary bathroom is shower size, since tile shower floors carry the highest cost per square foot of any interior surface in a home.

Other factors that move the number: plumbing relocation through a slab foundation (cutting concrete to reposition drain lines adds cost and time), vanity configuration (single vanity versus double vanity with integrated storage), cabinetry tier, countertop material from laminate to quartz top or natural stone, and frameless glass enclosure size. 

A curbless walk-in shower with a linear drain and large-format tile costs more than a tub-shower combo with a pre-pan.The final price is set after the design phase, when every material selection, plumbing layout, and finish decision is confirmed. For more context on what moves remodel costs, visit our cost guide.

Recent Gilbert Bathroom Project

Amy's Gilbert primary bathroom remodel replaced a dated tub surround and single vanity with a walk-in tile shower and double vanity with quartz countertop.

Amy's Master Bathroom Upgrade In Gilbert

Why PHR for Gilbert Bathroom Remodeling

Every Gilbert bathroom project starts in the design phase. Your in-house designer develops 3D renderings, selects tile and finish materials, and confirms plumbing layout before the construction price is set. The price you approve at the end of design is the price you pay at the end of construction.

PHR uses in-house tile installers, not subcontractors, on every shower and floor tile installation. A dedicated project manager handles trade coordination and communicates through the homeowner portal with daily updates.

ROC license 313636, A+ BBB rating, NARI and NKBA membership, and a 2-year labor warranty back every completed project.

3134 E Muirwood Dr Phoenix 14 scaled

What Do Homeowners Say?

Fuhrman video thumbnail

Click to play

Sanya Blair Video Testimonials scaled

Click to play

Mila Powell Video thumbnail

Click to play

Siene Garvin review video thumbnail

Click to play

Your remodel experience can be this amazing, reach out to get started!

Beautiful Bathroom Transformations Await!

View the incredible before and after transformations of our bathroom remodels!

How We Get It Done

Take a look at our hassle-free bathroom remodeling steps!

1

Schedule Your Consultation

Schedule a discovery call to begin your remodeling journey.
You'll receive remodel advice, get all your questions answered, discuss your remodel needs, and get a price quote from our Consultation Manager.

2

In-Home Evaluation

If it is a good fit, we schedule an in-home evaluation.
During the in-home visit, we’ll review your remodel plans, measure the space, and send you a written proposal afterward.

3

Planning & Design

After signing the feasibility, planning, and design agreement, you’ll begin the design phase.
We’ll work closely with you to plan the project scope, designs, and costs before construction kicks off.

4

Construction

You sign the construction agreement, and we kick off your bathroom remodel, providing regular updates to keep you in the loop.
Your dream space is done, perfect for enjoying and sharing with your loved ones and neighbors!

Bathroom Remodels Across Gilbert

Gilbert is one of the fastest-growing cities in the East Valley, and its housing stock reflects that growth. We work with homeowners in Stratland Estates, Sonoma Ranch, Val Vista Meadows, Highlands at Spectrum, Spectrum at Val Vista, Carol Rae Ranch, Silverhawke, Villa Madeira, Cooley Station North, Neely Farms, and Settler's Point South, as well as in Power Ranch North, Higley Park, and Lakeview Trails. Homes in these communities are primarily 1990s, 2000s, and 2010s builds in master-planned communities, many with HOA architectural review processes for structural changes.

To see all the remodeling services PHR provides across Gilbert,
visit our Gilbert remodeling page .

Phoenix Home Remodeling Service Areas
Outside of Our Outlined Service Areas?

(If you live outside of the red section, click here to receive an email intro to another contractor)

Trusted by homeowners just like you!

Expert Workmanship seal
Google 1 1
Facebook 1 1
Yelp 1 1
Houzz 1 1
License seal

More Interior Remodeling Services in Gilbert

If your remodel extends beyond the bathroom, PHR handles kitchen remodeling , entertainment wall and fireplace remodeling , and whole home remodeling across Gilbert and the East Valley.


Don’t hesitate! Begin today!

Satisfied Customers

Don't take our word for it; see our happy clients in their new spaces!

Some Of Our Past Bathroom Projects In Gilbert

Drag the slider across the photos to see before and after.

Kitchen Before Renovation After Renovation done by Phoenix Kitchen Remodeling
Debbie Bathroom Remodel Before Photos After
Dirk bathroom remodel before photos After
Tom and Lisa Bathroom remodel before photos After
Kim bathroom remodel before photos After
victoria bathroom remodel before photo victoria bathroom remodel after photo

Frequently Asked Questions About Bathroom Remodeling in Gilbert

How Much Does Bathroom Remodeling Cost In Gilbert?

Bathroom remodeling in Gilbert typically ranges from $18K-$75K with Phoenix Home Remodeling, depending on the bathroom type, layout, selections, and scope. A guest bathroom remodel is usually $18K-$25K, a primary bathroom remodel is $40K-$75K, and a shower remodel is $15K-$40K. PHR uses a planning-first design-build process, so the final price is provided only after design and selections are complete. That helps Gilbert homeowners near Agritopia, Val Vista Lakes, and Power Ranch understand the full scope before construction begins. The project minimum is $15,000, and each remodel is planned around a defined scope rather than guesswork.

How Long Does A Gilbert Bathroom Remodel Take?

A Gilbert bathroom remodel typically takes 3-7 weeks in construction, depending on whether it is a guest bath, primary bath, or shower remodel. Guest bathrooms usually take 3-5 weeks, primary bathrooms usually take 5-7 weeks, and shower remodels usually take 1-3 weeks. Before construction, Phoenix Home Remodeling completes a Feasibility, Planning, and Design phase that is usually about 6-10 weeks. This planning period is where layouts, selections, 3D renderings, scope, and fixed pricing are developed. For homes near Downtown Gilbert, Higley Road, or Williams Field Road, that upfront planning helps reduce disruptions once work begins.

What Is Included In Phoenix Home Remodeling's Bathroom Design Process?

Phoenix Home Remodeling's bathroom design process includes feasibility planning, layout development, material selections, 3D renderings, scope definition, and final pricing before construction begins. The company follows a design first, build second approach, which means the remodel is planned in detail before the construction schedule is finalized. During the design phase, homeowners review options for vanities, shower layouts, tile, lighting, storage, plumbing fixtures, and overall function. The planning and design phase usually takes about 6-10 weeks. This process gives Gilbert homeowners a clear view of the finished space and a defined scope before a single wall is touched.

Can I See 3D Renderings Before My Bathroom Remodel Starts?

Yes, Phoenix Home Remodeling provides 3D renderings before construction begins so you can see your bathroom design before the work starts. These renderings help you understand layout changes, tile placement, vanity sizing, shower proportions, lighting, and storage decisions in a visual way. For Gilbert homes in neighborhoods such as Morrison Ranch, Seville, and Val Vista Lakes, 3D renderings can be especially helpful when balancing updated function with the character of the home. The renderings are part of the planning-first process and are completed before the final price is provided. This helps align the design, selections, and scope before construction begins.

Does Phoenix Home Remodeling Offer Fixed Pricing For Bathroom Remodels?

Yes, Phoenix Home Remodeling provides fixed pricing after the design, selections, and defined scope are complete. The company does not finalize the construction price at the first conversation because the layout, materials, and project details need to be planned first. All projects begin with a Feasibility, Planning, and Design phase, which is usually about 6-10 weeks. Once the selections and scope are complete, the final price is presented before construction begins. This planning-first model has helped PHR maintain a 2.1% change order rate, which reflects how much attention is given to decisions before the construction team starts work.

Who Manages My Bathroom Remodeling Project In Gilbert?

A dedicated project manager manages your Gilbert bathroom remodel from the construction kickoff through completion. Phoenix Home Remodeling uses one design-build team from concept to completion, so there is no handoff between an outside designer and a separate contractor. Your project manager coordinates the schedule, trade partners, communication, jobsite updates, and quality details throughout the remodel. Homeowners also receive access to a homeowner portal where project details, updates, and communication are organized in one place. Whether your home is near SanTan Village, Loop 202, or the Heritage District, the process is built around consistent communication and a planned construction sequence.

What Types Of Bathrooms Does Phoenix Home Remodeling Remodel?

Phoenix Home Remodeling remodels primary bathrooms, guest bathrooms, powder bathrooms, and showers as part of interior remodeling projects. Primary bathroom remodels are typically $40K-$75K and usually take 5-7 weeks in construction. Guest bathroom remodels are typically $18K-$25K and usually take 3-5 weeks. Shower remodels are typically $15K-$40K and usually take 1-3 weeks. Each project is planned through the same design-build process, with design decisions, selections, 3D renderings, and fixed pricing completed before construction begins. This approach helps homeowners make confident decisions about layout, storage, materials, and long-term function before the remodel moves into the build phase.

How Does The Design-Build Model Help With Bathroom Remodeling?

The design-build model helps bathroom remodeling by keeping design, planning, pricing, and construction under one coordinated team. Phoenix Home Remodeling uses the principle design first, build second, which means the bathroom is planned before construction begins. The team works through layout, selections, 3D renderings, scope, and fixed pricing before the construction phase starts. This reduces confusion and helps the project manager coordinate the work around a shared plan. For Gilbert homeowners, especially in established areas near Gilbert Road or newer communities near Power Road, the design-build approach helps align the remodel with the home's layout, daily routines, and desired level of finish.

Is Phoenix Home Remodeling Licensed For Bathroom Remodeling In Arizona?

Yes, Phoenix Home Remodeling is licensed in Arizona under ROC 313636. The company is CMC Group Ventures, Inc. DBA Phoenix Home Remodeling and serves homeowners from its Chandler location. PHR focuses on interior remodeling, including bathroom remodels, shower remodels, kitchen remodels, laundry rooms, entertainment walls, and whole-home remodeling. The company was founded in 2017 and has earned 200+ reviews from homeowners across the East Valley. For Gilbert bathroom remodeling clients, the licensing, design-build process, homeowner portal, dedicated project manager, and 2-year warranty all support a planned and organized remodeling experience from concept to completion.

Does My Bathroom Remodel Come With A Warranty?

Yes, Phoenix Home Remodeling provides a 2-year warranty for bathroom remodeling projects. The warranty is part of a broader process that starts with planning, design, selections, 3D renderings, and fixed pricing before construction begins. During construction, a dedicated project manager coordinates the remodel and communicates through the homeowner portal. This structure helps the team track project details and address questions in an organized way. For Gilbert homeowners updating a primary bath, guest bath, or shower, the warranty gives added support after the remodel is complete. The goal is a well-planned interior remodeling experience with one team responsible from concept to completion.

Can Phoenix Home Remodeling Improve Bathroom Storage And Function?

Yes, Phoenix Home Remodeling can improve bathroom storage and function through layout planning, cabinetry choices, shower design, vanity configuration, lighting, and fixture placement. During the Feasibility, Planning, and Design phase, the team reviews how you use the room and what needs to work better. That may include better drawer storage, improved linen storage, a larger shower, a revised vanity layout, or more comfortable circulation. Gilbert homes near the Riparian Preserve, Agritopia, and Morrison Ranch often have different bathroom layouts, so the design process is tailored to the specific space. 3D renderings help you review these functional changes before construction begins.

How Do I Start A Bathroom Remodeling Project In Gilbert?

You can start a Gilbert bathroom remodeling project by scheduling a consultation with Phoenix Home Remodeling. The consultation helps the team understand your goals, the type of bathroom, your desired scope, and whether the project fits the company’s planning-first design-build process. From there, eligible projects move into the Feasibility, Planning, and Design phase, which is usually about 6-10 weeks. The team develops the design, selections, 3D renderings, and fixed pricing before construction begins. To begin, visit https://phxhomeremodeling.com/schedule-consultation/. The project minimum is $15,000, and PHR focuses on interior remodeling projects.

Where Can I See Bathroom Remodeling Examples From Phoenix Home Remodeling?

You can see remodeling examples from Phoenix Home Remodeling in the before and after project gallery. The gallery shows completed interior remodels and can help you understand how layout, materials, lighting, cabinetry, tile, and finish selections come together in real homes. Reviewing examples is especially helpful before the design phase because it can clarify your preferences for a primary bathroom, guest bathroom, or shower remodel. You can view the gallery at https://phxhomeremodeling.com/our-work. During your own project, PHR creates 3D renderings and a defined scope so you can review your bathroom design before construction begins.

Does Phoenix Home Remodeling Offer Financing Information?

Yes, Phoenix Home Remodeling provides financing information through Hearth for homeowners who want to explore payment options. Bathroom remodel pricing depends on the scope, with guest bathrooms typically $18K-$25K, primary bathrooms typically $40K-$75K, and shower remodels typically $15K-$40K. PHR provides the final construction price only after the design and selections are complete, which helps ensure the scope and pricing are aligned before work begins. You can review financing information at https://phxhomeremodeling.com/financing/. The design-build process still begins with planning first, so financing conversations can be considered alongside the overall project scope and schedule.

Can Phoenix Home Remodeling Coordinate A Bathroom Remodel With Other Interior Projects?

Yes, Phoenix Home Remodeling can coordinate bathroom remodeling with other interior remodeling projects when the overall scope fits the process. Many homeowners consider a bathroom remodel alongside a kitchen remodel, laundry room remodel, entertainment wall, or larger whole-home remodel. Kitchen remodels typically range from $50K-$100K and take 4-7 weeks in construction. Whole-home remodeling typically ranges from $150K-$300K and takes 1.5-3 months in construction. When multiple spaces are involved, the Feasibility, Planning, and Design phase helps coordinate layouts, selections, scope, schedule, and fixed pricing before construction begins. This is especially useful for Gilbert homeowners planning updates across connected living areas.

What Makes Phoenix Home Remodeling Different For Gilbert Bathroom Remodeling?

Phoenix Home Remodeling is different because it is a planning-first design-build remodeler that locks in the design and final price before construction begins. The company uses one team from concept to completion, 3D renderings before construction, fixed pricing after selections are complete, a dedicated project manager, a homeowner portal, and a 2-year warranty. PHR is licensed under ROC 313636, has 200+ reviews, and reports a 2.1% change order rate. For Gilbert homeowners near SanTan Village, Power Ranch, or Downtown Gilbert, that process creates a more organized remodeling path. Design first, build second is the core approach behind every bathroom remodel.

Gilbert Bathroom Remodeling With a 2-Year Labor Warranty

Phoenix Home Remodeling provides a 2-year workmanship guarantee on every completed bathroom remodel in Gilbert. If any issue with our labor arises after the project closes, we return and resolve it at no additional cost. Materials and fixtures installed during your remodel carry their own manufacturer warranties, which your project manager will walk you through at the final walkthrough.

PHR holds ROC license 313636, maintains an A+ BBB rating, and is accredited by both the National Association of the Remodeling Industry (NARI) and the National Kitchen and Bath Association (NKBA). The company has been voted a Nextdoor Neighborhood Favorite multiple years running and has received Best of Houzz Service awards from 2020 through 2026.

For Gilbert homeowners comparing contractors, the clearest protection comes from a fixed-scope contract, documented licensing, and a written workmanship warranty. All three are in place on every PHR project in the East Valley.

Get Expert Help On Your Remodeling

Use the blue button below to pick a time to talk with our remodel expert. Receive a phone call at the perfect time for you by scheduling your discovery call.

Our Consultation Manager reviews your remodel goals, answers questions, and shares an early investment range based on your bathroom type. If the project is a fit, the next step is an in-home evaluation followed by a written proposal for the Feasibility, Planning, and Design phase.

Waterproofing on Every Gilbert Bathroom Remodel

Every shower PHR builds in Gilbert uses a waterproofing membrane applied to all shower walls and the shower floor before any tile is set. The membrane system is continuous across seams, corners, and niche openings, which are the three locations where builder-grade shower assemblies most commonly fail over time.

Shower floors are built on a mortar bed sloped to the drain at a consistent pitch. Epoxy grout is used on all floor tile joints, and moisture-resistant caulking seals fixture penetrations and the joint between the shower floor and wall tile. Niches and built-in benches are individually waterproofed before tile is applied to their surfaces.

Before the project closes, PHR conducts a pre-completion water test on every new shower. Gilbert homes built in the 1990s and early 2000s with original builder-grade shower assemblies are particularly prone to long-term water intrusion behind tile, and this step verifies the installation before the homeowner takes possession.

PHR's in-house tile installation team handles all waterproofing and tile work directly, without subcontracting the shower. The 2-year labor warranty covers all waterproofing work completed on your Gilbert bathroom remodel.

We are Licensed, Bonded & Insured.  ROC# 313636

Check Out More Photos & Helpful Tips

YouTube logo

Watch videos of shower & bathroom remodels

patch website logo

Patch has helpful tips and info on bathrooms

Houzz logo

Project photos of bathrooms, kitchens, and more

nextdoors logo

Neighbor reviews on bathroom contractors

Bathtub Remodels

Bathtub remodels cover alcove tub replacements, drop-in tub installations, and freestanding soaking tub conversions. Tub deck configuration, floor-mounted tub filler placement, and tile surround selections are confirmed during the design phase.

 Accessories & Misc

Bathroom accessories include towel warmers, heated floor thermostats, recessed medicine cabinets, and hardware selections. Each is specified during the design phase and built into the fixed construction price.

Shower remodels

Shower remodels include tile work, waterproofing membrane installation, frameless glass enclosures, built-in niches, bench framing, and plumbing fixture configuration. PHR uses in-house tile installers on every shower project.

Vanity remodels

Vanity remodels cover cabinet replacement, countertop selection, sink and faucet configuration, and lighting placement. Single and double vanity conversions are laid out in 3D before construction begins.

Bathroom Remodeling in Gilbert, AZ

Phoenix Home Remodeling completes bathroom remodels across Gilbert with designs confirmed in 3D before construction begins and prices fixed after the design phase.

What Gilbert bathroom remodels with PHR typically include: 

  • Walk-in tile showers with waterproofing membrane and frameless glass
  • Tub-to-shower conversions with curbless or low-curb entries
  • Double vanity installations with quartz top or natural stone countertops
  • Freestanding and drop-in soaking tub replacements
  • In-floor radiant heat and programmable thermostat
  • Layered lighting with recessed fixtures, vanity sconces, and backlit mirrors
  • Custom cabinetry with soft-close drawers and dovetail joinery
  • Plumbing relocation and slab routing when the layout changes

For Gilbert homeowners ready to start, visit our bathroom remodeling page

Let's talk about what your top bath remodel project looks like! Give us a call at 602-492-8205.

Ready to Remodel Without Regret?

Call or Text Us 24/7:

602-492-8205

Or quickly book a time with our remodel expert: