Our Sun Lakes Shower Remodeling Services
Sun Lakes shower remodels typically involve replacing an original tub-shower combo or dated step-in shower with a curbless or low-curb walk-in design. We handle tile work, waterproofing, frameless glass, and fixture selections, all planned in 3D before construction starts.

Whole Bathroom Remodels →

Shower & Bathtub Upgrades →

Cabinet & Countertop Vanity Installs →
Sun Lakes shower projects cover everything from the pan and drain system up: we build the sloped pre-pan, apply a Schluter Kerdi waterproofing membrane across walls and floors, install large-format tile or mosaic floor tile, hang frameless glass enclosures, and plumb fixtures including handheld diverters, slide bars, and ceiling rain heads. Niche waterproofing and seam-banded corners are part of every install, not an add-on.
For homeowners who want a walk-in shower conversion, we also handle the layout change, moving drain locations and rebuilding the pan to create a curbless or zero-threshold entry. The full scope, including any plumbing changes, is priced before demolition starts so there are no surprises after the walls come down.
For the full scope of PHR shower work, visit our shower remodeling page.
Who is the Best Shower Remodeling in Sun Lakes?
In Sun Lakes, shower remodeling projects often include accessibility upgrades and layout modifications that require careful planning before construction begins. Phoenix Home Remodeling resolves all specifications, accessibility considerations, and material selections during a structured design phase before any demolition is scheduled.
These recognitions reflect independent evaluation of project quality, professional credentials, and ethical business standards within the Sun Lakes remodeling market.
- Rated Best Phoenix Bathroom Remodeler by Trust Analytica
- Rated 4.9 Stars Across 200+ Verified Public Reviews
- Member of the National Kitchen & Bath Association (NKBA)
- Accredited by the Better Business Bureau with an A+ Rating
- Member of the National Association of the Remodeling Industry (NARI)
- Named a Top Contractor in Arizona by Ranking Arizona (2024)
- Voted a Nextdoor Neighborhood Favorite (2022, 2023, 2024, 2025)
Before scheduling any shower demolition, Home Remodeling resolves waterproofing methodology, tile selection, fixture specifications, and pan or liner configurations during a structured planning phase. These decisions directly affect both cost and installation sequencing, so finalizing them before construction starts keeps the project on track and the budget accurate. Project management then oversees all trade coordination through the completed installation.
Sun Lakes homeowners who finalize shower layout and selections before construction begins typically experience cleaner installation sequencing, fewer material delays, and a completed shower that reflects the original design intent.
The distance between what a homeowner envisioned and what gets built is often determined during the planning phase.
Schedule your Sun Lakes Shower Remodeling Discovery Call to understand the full timeline and what daily life looks like during construction.
Why Your Neighbors Recommend Us
Real Stories. Real Results. Real Confidence.
How Much Does a Shower Remodel Cost in Sun Lakes?

Shower remodels in Sun Lakes typically run between $10,000 and $30,000. The primary cost driver is shower footprint. Tile shower floors carry the highest cost per square foot of any interior surface, so a larger curbless shower costs more than a tub-to-shower swap in the same footprint.
A linear drain or point drain placement, the choice between a sloped pre-pan and a foam shower pan, and the tile size and layout all affect labor time. Accessories add to the total: a handheld diverter is a smaller addition, while body jets and a ceiling rain head each require additional plumbing and fixtures.
Frameless glass runs higher than a rod-and-curtain finish. For a full breakdown of what moves shower project costs up or down, see our remodeling cost guide.
Recent Project
Jill Lombardi's Sun Lakes primary bathroom overhaul included a full shower conversion, updated tile, and vanity work planned through PHR's design-build process.

Why PHR for Shower Remodeling in Sun Lakes
Every Sun Lakes shower project we take on is designed in 3D and priced before demolition starts. That means you see the finished layout, tile selections, glass enclosure configuration, fixture placements, before a single wall comes down.
Waterproofing is handled by our in-house tile team, not a subcontractor. We install a Schluter Kerdi membrane across walls and floors, seal niches and corners, and run a pre-completion water test before closing the project. The 2-year labor warranty covers the finished work.
Fixed pricing is set after the design phase is complete, so the number does not change mid-construction. One dedicated project manager handles scheduling, material coordination, and daily updates through the BuilderTrend portal.
Phoenix Home Remodeling holds a 4.9-star rating across more than 200 verified reviews and has completed more than 500 remodeling projects across the Phoenix metro, including Sun Lakes.
What Do Homeowners Say?
Your remodel experience can be this amazing, reach out to get started!
See It to Believe It
Discover the impressive transformations in our project gallery!
How We Work
Take a look at the simple steps in our shower renovation process!
1
Begin Your Remodel Journey
Book a discovery call to receive valuable advice and clarify your questions.
2
Personalized Home Evaluation
If the fit is right, we’ll arrange a personalized in-home appointment to discuss your project and take measurements.
3
Collaborative Planning Phase
By signing the planning and design agreement, you begin a collaborative process.
4
The Build Begins
With the construction agreement in place, we’ll start your project while keeping you updated every step.
Shower Remodeling Across Sun Lakes
We work throughout Sun Lakes, serving homeowners in Cottonwood Palo Verde, Ironwood, Sun Lakes Country Club, Sun Lakes Oakwood, and Sun Lakes Palo Verde. These are gated golf course communities with single-story ranch-style homes built primarily between the 1970s and 1990s, and shower remodels here often involve walk-in shower conversions from original tub-shower combos alongside accessibility upgrades.
For homeowners in nearby Chandler communities like Sun Lakes West and Sunbird Golf Resort, or in Ahwatukee just to the north, we handle the same scope of shower work. To see our full range of remodeling services in this area, visit our Sun Lakes remodeling page.

(If you live outside of the red section, click here to receive an email intro to another contractor)
Trusted by homeowners just like you!






Other Remodeling Services in Sun Lakes
If your project goes beyond the shower, we also handle Kitchen remodeling, Entertainment wall remodeling, and Whole home remodeling for Sun Lakes homeowners.
Before & After Shower Gallery
Slide the images to see how we turned outdated showers into dream spaces.
FAQs: Quick and Easy
Explore our most frequently asked questions about shower remodeling in Sun Lakes. Still have more questions? Reach out to us, we’re happy to help with anything you need!
Most shower remodels in Sun Lakes run between $10,000 and $30,000.
The primary driver is shower size, since tile shower floors carry the highest cost per square foot of any interior surface.
A curbless walk-in conversion, frameless glass, and added fixtures like a ceiling rain head or body jets all move the number higher within that range.
Sun Lakes homes built in the 1970s through 1990s are slab-on-grade, so moving drain locations requires cutting through the concrete slab.
We price any plumbing relocation during the design phase so the cost is built into the fixed construction price before demolition starts, not discovered after the floor is open.
We install a Schluter Kerdi sheet membrane across shower walls and floors before any tile is set.
Niches and bench surfaces get the same treatment, and all seams and corners are banded. A pre-completion water test is run before we close the project.
Yes. Converting an original tub-shower combo to a curbless or zero-threshold walk-in shower is one of the most common projects we run in Sun Lakes. The drain location is relocated through the slab during the planning phase, and the new shower pan is built with a sloped pre-pan to ensure proper slope to drain.
Mosaic floor tile and hex tile are practical choices for shower floors because smaller format tiles allow more grout lines, which improves traction.
Large-format tile can be used on shower floors with a proper sloped pan and linear drain. Our designer walks through options during the planning phase.
Yes. Frameless glass is the most common enclosure option on Sun Lakes projects. We also install semi-frameless glass and fixed panel configurations depending on the layout.
Glass selection is finalized during the 3D design phase so you see the full look before construction starts.
Yes. Many Sun Lakes homeowners request grab bars, a fold-down shower seat, or a built-in bench alongside the cosmetic remodel.
We install structural blocking in the walls during construction so grab bars are properly anchored. A curbless entry removes the threshold entirely for easier access.
During the planning phase, we finalize the shower layout, drain placement, tile selections, waterproofing system, glass configuration, and all fixture specifications.
These decisions are captured in a 3D rendering and a fixed construction price. Construction does not start until you have reviewed and approved both.
Yes. PHR employs an in-house tile team. Waterproofing and tile installation are not subcontracted.
This means the same team that installs the Schluter Kerdi membrane also sets the tile, which eliminates the coordination gaps that cause water intrusion issues.
PHR provides a 2-year labor warranty on all completed shower work.
The warranty covers workmanship, including tile installation, waterproofing, and fixture connections. Manufacturer warranties on fixtures and glass enclosures run separately.
We install a full range of shower plumbing: pressure-balance valves, thermostatic valves, handheld diverters, slide bars, body jets, and ceiling rain heads.
Fixture selections are finalized during the design phase and included in the fixed construction price.
The design-build process ties the designer and the construction team to the same scope and price. Once the 3D design is approved and the fixed construction price is signed, the number does not change unless the homeowner requests a scope addition.
There are no discovery charges mid-project.
Yes, the shower being remodeled will be out of service during construction. If you have a second bathroom, most Sun Lakes homeowners use it during the project.
Your project manager outlines daily work hours and a weekly schedule before construction starts so you know what to expect.
Material selections are finalized and ordered before construction starts.
If a lead-time issue arises, your project manager notifies you before it affects the schedule and presents alternatives at the same spec level.
We do not start demolition until materials are confirmed.
No. We coordinate gate access for our crews before the project starts.
Sun Lakes Country Club, IronOaks, Oakwood, Cottonwood, and Palo Verde all have gated entries, and we have run projects in each community.
Walk-in shower conversions — replacing an original tub-shower combo with a curbless or low-curb walk-in design — are the most common request.
Single-handle or thermostatic valve upgrades, built-in bench additions, and large-format tile replacements are also common on Sun Lakes projects.
PHR partners with Hearth for financing options on qualifying projects.
Your project manager can share details during the discovery call.
From Ordinary to Amazing Starts Here!
Start planning your Sun Lakes shower remodel today.
How We Approach Walk-In Shower Conversions in Sun Lakes
Most Sun Lakes homeowners asking about a shower remodel are starting from an original tub-shower combo or a dated step-in shower. The opening question is always the same: what do you actually want the space to do?
For homeowners who want easier daily access, a curbless or zero-threshold shower removes the step-over entirely. We relocate the drain through the slab during the design phase, build the sloped pre-pan to direct water to a point drain or linear drain, and apply the waterproofing membrane before any tile goes in.
For homeowners who want a larger shower footprint, we work through the layout change in 3D first, adjusting the glass enclosure configuration, niche placement, bench or fold-down seat location, and fixture positions before construction starts. The fixed price is set once the design is finalized.
What Sun Lakes Homeowners Select on Shower Projects
Tile and waterproofing decisions drive the most questions during the planning phase. Mosaic floor tile and large-format wall tile in a vertical stack are the most common combinations on Sun Lakes projects. Epoxy grout is worth the upgrade on floor tile for long-term durability.
Fixture selections run from a basic pressure-balance valve with a handheld diverter on a slide bar, up to a thermostatic valve with a ceiling rain head, body jets, and a separate handheld. All fixture placements are set in the 3D design so rough-in locations are confirmed before the walls close.
Recessed niches, a built-in bench, or a fold-down shower seat are common additions. Each gets the same waterproofing treatment as the surrounding walls, including niche waterproofing and seam-banded corners, before tile sets.

We are Licensed, Bonded & Insured. ROC# 313636
Shower Remodeling in Sun Lakes, Arizona
Phoenix Home Remodeling is a design-build remodeling company serving Sun Lakes, a 55+ active adult community where homes from the 1970s through 1990s frequently need shower layout updates, walk-in shower conversions, and accessibility upgrades.
We work in Sun Lakes Country Club, IronOaks, Oakwood, Cottonwood, and Palo Verde. Projects range from a straightforward tub-to-shower swap in a single-bath master to a full curbless conversion with grab bar blocking, a fold-down seat, and lever-handle fixtures.
Materials, waterproofing systems, tile selections, and fixture placements are all finalized during the design phase and included in a fixed construction price. Our in-house tile team handles waterproofing and tile installation on every project.
For the full scope of what we offer, visit our shower remodeling service page.
Ready to Remodel Without Regret?
Call or Text Us 24/7:
602-492-8205
Or quickly book a time with our remodel expert:














